Skip to content
/ HOME / RUNBOOK
RUNBOOK · V4.2

The runbook,
in public.

Six ticket classes. Three tiers. Four pipeline states. One SLA contract. Most ticket pages on installer sites are sales decks — ours is the literal document the operator follows on site. It's where the bracket comes off the rack.

CATALOGUE · INDEX $189 → $389
STD-65
Standard wall · $189
FPL-75
Fireplace · $289
ARM-65
Full-motion arm · $239
MIG-99
Migrate & refit · $219
CBL-IN
In-wall cable · +$89
SND-BR
Soundbar · +$79
SERVICE · CATALOGUE

Six ticket classes.
Each fully scoped.

Every class has a fixed scope, a fixed price, a target time on site, and a documented exit condition. Anything not on this list goes to ops review — you'll get a custom ticket back inside the standard intake SLA.

STD-65 ~45 MIN

Standard wall mount

Studs located, screen seated, levelled to ±0.2° (laser-checked twice). Cable run tidied to the console position in a clip channel. Bracket included — fixed or tilt depending on viewing angle.

32" → 85" · drywall or masonry $189
FPL-75 ~75 MIN

Above the fireplace

Pull-down bracket so the screen drops to a viewing-correct neck height when watching. Surface temperature monitored on gas units — runbook auto-aborts if thermals exceed envelope.

up to 75" $289
ARM-65 ~65 MIN

Full-motion arm

Tilt-pivot-extend bracket for off-axis seating, kitchen islands, or corner sofas. Full sweep tested under load before signoff. Cable management for the swept path.

up to 65" $239
MIG-99 ~60 MIN

Migrate & refit

Decommission existing install, patch source wall ready for paint, redeploy target wall. Single-ticket, single-trip. Useful for moves, renovations, room reshuffles, divorces.

patch incl. ready for paint $219
CBL-IN ADD-ON · +30 MIN

In-wall cable run

HDMI and signal hidden inside the wall via code-compliant in-wall kit (no power through low-voltage gangs). Power outlet relocated behind the screen. Patched ready for paint.

drywall only · masonry → channel +$89
SND-BR ADD-ON · +25 MIN

Soundbar bracket

Soundbar bracketed below or above the screen, audio cable routed via the same channel. BYO bar — Sonos, Bose, Samsung, Yamaha. We bring the bracket, the bolts, the patience.

any brand · BYO bar +$79
PACKAGING · TIERS

Three tiers.
Most land in B.

Tickets roughly cluster around three configurations. The middle tier is what 64% of intakes turn out to be. Final number is what we quote after intake review — but these are reliable starting points.

TIER A · BASE

The Standard

$189FLAT

STD-65 single ticket. Standard wall, drywall or masonry, screen under 65". The bulk of what we run.

  • Bracket included (fixed or tilt)
  • Stud-found · levelled ±0.2°
  • Cable run tidied in clip channel
  • SLA p95 90-min arrival
  • 12-month workmanship cover
OPEN TIER A TICKET
TIER B · STANDARD

The Workhorse

$289FLAT

Larger screen, fireplace, or full-motion arm. The middle ground that covers 64% of intakes.

  • Pull-down or full-motion bracket
  • Heat / surface envelope check
  • Range tested under load
  • Cable management included
  • 12-month workmanship cover
OPEN TIER B TICKET
TIER C · EXTENDED

The Full Deploy

$389FLAT

Large screen, in-wall cable run, soundbar bracket. The end-to-end "make the wall look like a render" ticket.

  • Pull-down or full-motion bracket
  • In-wall cable (code-compliant kit)
  • Soundbar bracketed & wired
  • Source wall patched for paint
  • 12-month workmanship cover
OPEN TIER C TICKET

All tiers include bracket, all hardware, basic cable tidy, dust mat, dust extraction, and 12-month workmanship cover. Add-ons (CBL-IN, SND-BR) appear as separate line items on the quote so you can read the runbook end-to-end before commit.

CATALOGUE · TABLE

All ticket
classes, by row.

Same six classes, in a row layout. For the operators reading this on a phone outside someone's flat, this is the version that's actually useful.

TICKET SCOPE SLA · ON-SITE PRICE
STD-65
Standard wall mountDrywall or masonry · 32"–85"
~ 45 MIN $189
FPL-75
Above the fireplacePull-down · thermals checked
~ 75 MIN $289
ARM-65
Full-motion armTilt · pivot · extend
~ 65 MIN $239
MIG-99
Migrate & refitDecommission + redeploy · same trip
~ 60 MIN $219
CBL-IN
In-wall cable run · ADD-ONCode-compliant kit · drywall only
+ 30 MIN + $89
SND-BR
Soundbar bracket · ADD-ONBYO bar · any brand
+ 25 MIN + $79
PIPELINE · STATES

Four states.
One ticket.

Every ticket transitions through these four states left to right. You can ask which state your ticket is in at any time — by reply, by dashboard link, or by quick call to ops.

Intake

Photo of the wall, screen model, postcode. Ticket opened, classified to a ticket class, queued for review. You receive a ticket ID by reply.

OWNER · OPS SLA · 0 SEC

Quote & Slot

Ops reviews intake, returns a flat quote with the next two viable slots. Quote variance from final invoice is contractually zero.

OWNER · OPS SLA · p50 11 MIN

Dispatch

Slot confirmed, operator and van pinned to the ticket. 90-minute arrival window p95 from the start of the booked window.

OWNER · OPERATOR SLA · p95 90 MIN

Install & Signoff

Runbook executed — protect, locate, drill, mount, test, tidy. You sign off on the device. Ticket closes. Receipt and warranty PDF go out automatically.

OWNER · OPERATOR ~ 60 MIN ON SITE
FAQ · KNOWN ISSUES

Seven things
tickets often ask.

The questions that show up at intake most often, answered with the same straight reply they'd get on the dashboard. If yours isn't here, open a ticket and we'll add it.

FAQ-01 How do you quote without seeing the wall? +

The intake photo and the screen model carry ~95% of the relevant signal — wall surface, stud-finder reading, outlet position, geometry. We've reviewed 7,341 of them.

Where the wall is hiding something unusual (buried lintel, fire running hotter than spec, plaster-on-lath on an older building), we tell you on site before commit. Across the run, we've never charged above the quoted price. If you'd rather have voice intake, ring ops — but the photo is faster.

FAQ-02 Same-day, realistic or theatrical? +

Realistic. Intake before 15:00 → 82% of tickets close same-day. We hold two open slots per day per operator specifically for same-day dispatch. The dashboard surfaces those slots in real time at intake.

FAQ-03 Do I need to buy a bracket? +

No. The bracket is included in every flat price — fixed, tilt, pull-down, or full-motion depending on ticket class. VESA-matched at intake, load-rated for the screen weight. If you've already bought one and want us to fit yours, we will, but the ticket price doesn't change.

FAQ-04 What about plaster-on-lath or older buildings? +

Reza's specialism. Pre-1940s lath behind plaster, picture rails over the studs, weird brick courses behind wallpaper — we've documented runbooks for each. Ticket price is the same. We just take a bit longer and bring the steel spanning rail across joists where needed.

FAQ-05 In-wall cable run — always possible? +

On drywall, almost always. Code-compliant in-wall HDMI kit and a relocated power outlet behind the screen.

On masonry, brick, or load-bearing walls, we use a surface wall channel instead — visually the same end result, but we don't chase brick (it's a plasterer's job, not ours). If we have to drop from in-wall to channel, the +$89 add-on comes off the ticket automatically.

FAQ-06 What's the warranty model? +

12 months on workmanship, full re-install at our cost. The bracket carries its own manufacturer warranty (typically 5 years) and we hand you the paperwork on signoff. Bracket warranty claims we'll administer for you — text the ticket, we send the photos and serial to the manufacturer.

FAQ-07 Payment — when and how? +

After signoff. No deposit, no card on file. Tap-to-pay on the device on site, or we send a payment link by text the same evening. The invoice always matches the quote exactly — that's SLA-03 and we get paged if it doesn't.

QUEUE · OPEN

Open a ticket.

Intake takes about 90 seconds. Photo of the wall, screen model, postcode. You'll get a ticket ID back inside the hour and a quote inside fifteen minutes during open hours.